To provide sufficient headroom for Unicode and SAP ERP 6.0 in its test and development environments, Siteco's IT team used VMware VMotion to migrate 50 virtual SAP and Oracle servers from the existing hardware platform to four new Intel Xeon 7400 processor-based IBM System x... |
08 Jul 2009 |
| |
Katorg worked with c.a.r.u.s. IT to implement a new IBM System x 3850 M2 server, running virtualized SUSE Linux Enterprise Server environments with VMware technology to support an SAP Business All-in-One solution from Info AG. The company also implemented a new SAN based on ... |
27 May 2009 |
| |
ESK worked with IBM to replace its existing servers with 5 IBM System x3650 servers with quad-core Intel® Xeon® X5450 processors, running VMware Infrastructure Enterprise to enable server virtualization. 2 of the x3650s now run virtual servers for all 7 SAP application envir... |
19 Jun 2009 |
| |
Flintshire selected IBM System x3950 servers to support its new virtualised Windows environment. The four 8-way x3950s in active use run 40 VMware servers between them, but Flintshire has successfully run more than 30 VMware servers on each one. |
21 Jul 2008 |
| |
Clinique Pasteur worked with Computacenter to consolidate and virtualize its storage and application server infrastructure, producing significant cost savings in administration. |
01 Jun 2006 |
| |
Flintshire will remove a total of 80 physical servers from its infrastructure by virtualising them to VMware partitions on six IBM System x3950 servers, reducing its power consumption and cutting carbon emissions. |
21 Jul 2008 |
| |
IBM provided hardware consolidation and virtualization with IBM BladeCenter® and IBM System x® servers along with IBM VMWare Infrastructure and VMotion software. |
23 Apr 2009 |
| |
This case study shows how Gabor Shoes, a German shoe manufacturer, minimized risk by implementing a centralized IT infrastructure across two data centers. The solution included IBM System x3850 M2 servers running VMware and IBM Tivoli Storage Manager for backup management. |
16 Sep 2009 |
| |
Punahou School virtualized 40 physical servers to VMware virtual servers on four IBM System x3850 M2 servers, reducing energy costs in the data center by an estimated 60 percent, freeing up rack space, cutting carbon emissions and enabling greater flexibility and responsiven... |
08 May 2009 |
| |
Working with Triangle (www.triangle-group.com), St Helens Council consolidated 89 ageing servers to a new architecture - based on four IBM System x3850s, one x3650 and an IBM BladeCenter, and using VMware to virtualize the environment. |
25 Oct 2007 |
| |
This case study shows how Northwest Radiology Network improved the reliability and availability of their diagnostic reporting IT infrastructure with IBM System x3650 and IBM System Storage DS3400. |
03 Apr 2008 |
| |
Facing a 400 percent increase in transactional volumes, CBH Group created a dynamic infrastructure built around IBM Power 550 Express servers, IBM System x3850 M2 servers and IBM System Storage DS4800 arrays. The new dynamic infrastructure is more powerful, compact and effic... |
06 May 2009 |
| |
Carlin Music worked with Northdoor to implement an IBM System i525 for core business systems, two IBM System x3550 servers running VMware virtualisation software, and a storage area network based on an IBM System Storage DS3400. The solution has improved performance while he... |
08 Jan 2009 |
| |
This IBM case study shows how West Berkshire Council used IBM System x 8-way servers and VMware to implement server and storage consolidation and virtualization across the organization. The Council consolidated more than 80 physical servers, improving systems flexibility and... |
26 Sep 2006 |
| |
A family-based group of construction, property management and equipment rental companies in the United States reduces its management burden and power consumption by 70 percent when it consolidates 14 servers onto one IBM System x3850 platform |
29 Jul 2008 |
| |
Managing servers took up vast amounts of Flight Centre's time and data centre space was limited. Standardising on xSeries and BladeCenter, Flight Centre used IBM Director to automate management / deployment and VMware for consolidation. They expanded computing capacity, shru... |
17 Apr 2006 |
| |
Kalgoorlie Consolidated Gold Mines (KCGM) was looking to replace its ageing server environment. The enterprise also sought a hardware supplier willing and able to provide exemplary technical support for its geographically remote operations |
09 Dec 2008 |
| |
To better support its growing Web-based services and 24-hour call centers, the INPS wanted a more powerful business continuity system. The INPS wanted to integrate its existing disaster recovery system with a continuous-operation architecture to facilitate service to users a... |
23 Jun 2008 |
| |
This case study shows how Danske Telecom consolidated and virtualized on IBM System x3650 servers to improve systems reliability and flexibility, increase capacity, reduce server footprint, decrease operating costs, and accommodate future growth. |
03 Nov 2008 |
| |
Flintshire County Council has worked with IBM with the aim of consolidating and virtualising the major components of its infrastructure, using IBM System i to run systems under AIX, i5/OS and 64-bit Linux, IBM System x and IBM BladeCenter to host virtualised Windows servers. |
21 Jul 2008 |
| |
By virtualizing 28 stand-alone servers, Östgöta Brandstodsbolag successfully consolidated to just four IBM BladeCenter HS21 blades in a single chassis. The IBM solution reduced complexity and TCO, increased performance and availability, and enabled faster deployment of new s... |
20 Feb 2008 |
| |
PC Connection used IBM System x solutions to help update their data center with high-performance servers able to run critical database applications, support a high-traffic Web site and deploy a redesign of a mission-critical sales application. |
26 Sep 2006 |
| |
This case study shows how Scottish retailer Scotmid replaced an aging HP infrastructure with IBM System x, IBM System p, and IBM System Storage hardware, then virtualized the company’s mission-critical applications with VMware, enabling new levels of IT performance and flexi... |
12 Dec 2008 |
| |
A plan grew from a tactical approach aimed at reducing costs into a long-running strategic partnership in which this small-town healthcare mainstay receives IBM large-enterprise consulting and world-class technology. |
18 Aug 2008 |
| |
Working with Dolmen, an IBM Premier Business Partner, FOD Economie migrated its Java applications from the mainframe to four IBM System x servers running IBM WebSphere Application Server 6.1 under VMWare ESX and SUSE Linux. |
28 Nov 2007 |
| |
With its own subsidiaries at 31 locations in 23 countries worldwide, the German machine manufacturing company ARBURG GmbH + Co KG ranks among the leading manufacturers of injection molding machines that meet any need. |
30 Dec 2008 |
| |
ILS Consult, an IBM Business Partner, helped Bayerische Asphalt-Mischwerke to develop a new liabilities management application on the company's IBM Lotus Notes and Domino platform, which runs on Microsoft Windows Server 2003 under VMware on IBM System x3650 servers. |
16 Apr 2009 |
| |
IBM Global Business Services leveraged its electronics and automotive industry expertise to design, deploy and manage a solution based on SAP Business Suite. Niteo, an IBM Business Partner, also helped implement IBM Cognos Planning, which captures data downloaded from the SA... |
17 Aug 2009 |
| |
Flintshire has almost completely virtualised its server landscape on several different IBM platforms (IBM Power Systems, IBM System x, IBM BladeCenter), creating a flexible and scalable infrastructure
that requires less energy and emits less CO2. |
07 Jul 2009 |
| |
New Zealand supermarket operator Progressive Enterprises looked to build its business organically and by acquisition. IBM Global Technology Services provided a one-stop shop, building an IT infrastructure capable of supporting new SAP applications, meeting demands for scalab... |
29 May 2007 |